Through the preparing from the Doing work platform and ahead of the start with the drilling, an investigation really should be performed to assure the absence of any obstructions at the pile spots.Demolition of the surplus concrete earlier mentioned the Lower-off stage shall be completed by operatives employing jackhammers.This requires picking out